What information is needed before submitting a project evaluation?

Complete water quality, treatment capacity, and target information can improve the efficiency of preliminary assessment and reduce repeated communication.

Basic Information

  • Water quality test report and sampling notes.
  • Treatment capacity, operating time, and fluctuation range.
  • Existing process flow and main equipment.
  • Target discharge, reuse, or recovery indicators.
  • Site space, energy, and material constraints.

Project Stage

Indicating whether the project is at the preliminary consultation, bench-scale or pilot-scale testing, solution comparison, or engineering procurement stage helps determine the required data depth and next steps.

Additional Information

If available, project photos, PFDs, equipment lists, historical operating records, or chemical costs can also be submitted.

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top